Reconstruction of Pavilion No. 4 the Care and Treatment Center in Cracow and implementation of an educational program in the field of long-term care

 

×

Error

[sigplus] Critical error: Image gallery folder reconstruction/march2016 is expected to be a path relative to the image base folder specified in the back-end.

[sigplus] Critical error: Image gallery folder reconstruction/march2016 is expected to be a path relative to the image base folder specified in the back-end.

As part of the investment, the reconstruction of Pavilion No. 4 of the Care and Treatment Center in Cracow along with the purchase of necessary medical equipment, including wheelchairs and chairlift, which will enable professional care and treatment in the Department.

The aim of the investment activities planned as part of the project is to improve the conditions and quality of medical services provided at ZOL in Cracow, increase the comfort and safety of patients and adapt the existing building to the applicable law and the needs of disabled people.



The scope of work includes:

  • construction of an elevator shaft with a vestibule at the southern end of the building
  • extension of the evacuation staircase and goods and passenger lift at the north end of the building
  • building balconies with brick walls
  • additional ramps for the disabled
  • changing the layout of the rooms - mainly remodeling the rooms from 4-patient to 2-patient rooms. It is planned to leave one 4-person room on each floor for seriously ill patients.
  • facade insulation 10 cm styrofoam
  • reconstruction of horizontal insulation of the basement walls
  • thermal and anti-moisture insulation of basement floors.

The result of these activities will be increasing the hospital area, increasing the number of sanitary rooms, replacing medical equipment, improving the health safety of ZOL patients, improving social conditions, eliminating sanitary hazards.

The designed elements of technical infrastructure will be complementary to the existing housing facilities and equipment of the Care and Treatment Center in Cracow.

March 2016 - 2nd stage



{gallery}reconstruction/march2016{/gallery}

September 2015 - 1st Stage

{gallery}reconstruction/september{/gallery}

June 2015

{gallery}reconstruction/june{/gallery}

March 2015

{gallery}reconstruction/march{/gallery}



 